+39 059 819288 info@zetagear.it

198 kWp photovoltaic system completed:
a new milestone in energy efficiency

In October 2025, Zetagear completed the installation of a new 198 kWp photovoltaic system, further strengthening the company’s commitment to sustainability and energy-efficient operations.

The system features 450 monocrystalline modules of 440 Wp mounted on the pitched roof of the main building, covering an area of approximately 880 m² with an aluminium-steel mounting structure designed for durability and optimal performance.

Energy production is managed through a distributed conversion system with two 100 kW HUAWEI three-phase inverters, connected to 22 module strings. The string and interface boards, equipped with protection systems compliant with CEI 0-21 standards, have been fully installed and tested.

This investment marks an important step towards greater energy autonomy and demonstrates the company’s commitment to adopting advanced technologies while reducing environmental impact.

The project was carried out with the support of the European Funds of the Emilia-Romagna Region, as indicated in the accompanying official documentation.